Episodes Preview bi_dk1_follower Visualizer
7.27k episodes · 50 fps · 3 cameras · 224×224 libx264

Actuator unboxing, 21 h (earlier export)

The same 7,271 episodes as actuator_unboxing_20h_345_v2 in an earlier export with per-episode video files (21.4 h vs 21.0 h). Two runs in the post predate the v2 export and trained on this one.

One of the nine training datasets behind the Dream Machines post Empirical results fine-tuning π0.5 on a real manufacturing task (September 2026), which fine-tunes π0.5 on this task and reports what mattered: training duration, LoRA vs. full fine-tuning, data quantity, scene diversity, data quality, intervention data and serving settings. Used in Section 2.1 (the 210k-step checkpoint ladder) and Section 2.2 (LoRA rank 64 at EBS 256).

The task

Actuators arrive in cardboard boxes and must be transferred into a tray that fixes their position and orientation for a downstream production line. Each actuator is inserted with its bottom contacts correctly oriented, with both possible 180° rotations acceptable. Only the top layer of the source box is used: 40 actuators. The left arm picks an actuator from the box and hands it to the right arm, which inserts it into one of the tray's 135 holes, arranged in 9 rows of 15. The order is fixed: actuators leave the box right to left and bottom to top, and fill the tray left to right and bottom to top. Every episode starts and ends in a rest position.

The post describes the task, the collection and the evaluation protocol in full: Section 1.

This dataset

  • The complete filtered collection described below, exported before v2.
  • Prefer actuator_unboxing_20h_345_v2 for new work; it is the export the post's baseline uses.

Collection

  • Robot: bimanual TRLC-DK1 (bi_dk1_follower), recorded at 50 Hz.
  • Cameras: three fisheye cameras (left wrist, right wrist, top context) recorded at 640×480 MJPG and centre-cropped to 224×224 in this export, matching π0.5's SigLIP input size.
  • Teleoperation: two operators, one with a VR headset (our open-source VR teleop kit), one with Gello leader arms.
  • Scenes: four office desks and a lightbox, day and night; box and tray positions randomised independently over about 11×11 cm.
  • Filtering: every episode was rated 1 to 5 (1 an irrecoverable failure, 3 a minor mistake, 5 a clean execution); only episodes rated 3 or above are kept, and idle periods at the start and end are trimmed.

Contents

Episodes 7,271
Frames 3,855,796 (21.4 h at 50 Hz)
Cameras 3: left_wrist, right_wrist, top, 224×224
State / action 14-dim: six joint positions and one gripper per arm, absolute joint targets
Format LeRobot v3.0

Results in the post

  • 210k-step run evaluated every 10k steps at n = 40: success rose until about 30k steps, then bounced between 32.5% and 75% with no trend (best checkpoint 30/40 at 150k).
  • LoRA rank 64 on all linear layers, EBS 256, lr 5e-4: 45% (18/40).

All evaluations: 40 rollouts per round in the lightbox, one per actuator of the top layer, end-to-end success with Wilson 95% intervals; see the evaluation protocol.

Related datasets

Citation

@misc{dreammachines2026pi05,
  title  = {Empirical results fine-tuning π0.5 on a real manufacturing task},
  author = {Dream Machines},
  year   = {2026},
  url    = {https://dream-machines.eu/blog/pi05-fine-tuning}
}
Downloads last month
426